Specialty Manufacturerof Powder
and Granular Material Feeders

CASE STUDY

Solid Waste Recycling Facility

What is a solid waste recycling facility?

Garbage/trash is dumped into the kiln as is.
The kiln rotates slowly to encourage biodegradation.The organic matter is completely biodegraded in about 3 days and then discharged as recyclable material with odors significantly reduced.
Then, the material is crushed, sorted, and charged to a cement calcination kiln.

キーワード

Garbage Recycling Facility What is a solid waste recycling facility? Garbage/trash is dumped into the kiln as is. The kiln rotates slowly to encourage biodegradation. The organic matter is completely biodegraded in about 3 days and then discharged as recyclable material with odors significantly reduced. Then, the material is crushed, sorted, and charged to a cement calcination kiln. A-04 Skip Convayer Kiln Skip Convayer First Crusher Magnetic Separator Iron Trommel Stainless Steel Separator Alminum Separator. Second Crusher Smaler than 40mm Bucket Elevator Loop Feeder LF 3000 DH YOSHIKAWA Corporation

CONTACT

Please feel free to contact us for a consultation, inquiry, or request for a quotation regarding our products.
We also accept inquiries by phone or fax.

TEL/+81-996-26-3388
FAX/+81-996-26-3688

Phone inquiry hours: 8:30 a.m. to 5:00 p.m. Japan time
(except Saturdays and Sundays)
Fax inquiries can be received at any hour.